1 地板安装
Linshun to introduce you to the installation of cold storage 1 floor installation, first leveling the floor, then began to press the installation of the floor, select a beautiful floor in a conspicuous place, and do a good job of floor and evaporator drainage system. Quality requirements: Floor installation level, uneven use of materials to level the floor pad, and locking plate and plate between the lock Hook, to level the warehouse surface, no hollow feeling. Note that this drainage system shall be insulated if the reservoir body is installed outside the north. 2 vertical plate installation, according to the site conditions first select a corner, and positioning (namely the floor and floor locking) to extend to both sides of this angle, only the vertical plate and the vertical plate locking, meet the corner position, beautiful plate placed in a conspicuous place, installed to the evaporator that side, the drainage pipe to do a good job in advance, outside the library to do U Bend and play Silica Gel. Quality Requirements: The prominent surface of the vertical plate is flat, there is no concave point on the warehouse plate, the head surface of the vertical plate is even, the gap between the vertical plate and the vertical plate is even, the prominent vertical angle is even with the floor angle. 3. For the installation of the ceiling, first select one end to locate the angle of the ceiling and extend the paving, the ceiling and the ceiling are locked, and when the installation is carried out, one end of the ceiling and the vertical board are kept flat and locked to prevent the running. Quality Requirements: eye-catching part of the ceiling to choose a beautiful ceiling, the sky and vertical joints to level off, small gaps, the library between the ceiling. The Sky, the ground, the vertical plate is installed, the sky and the vertical, the vertical and the floor between the correction level and lock, each other all lock hook. Meet the need to saw the library board, SAWS TO BE POLISHED, no Burr, meet the library board to pull angle aluminum, first Silica Gel, and then pull angle aluminum, to ensure sealing. After the installation of the library, row time to play Silica Gel, Silica Gel sewing smooth, smooth, Silica Gel best row at the end of the day to deal with, in case of damage. 4. Equipment installation according to the construction drawings and site to determine the situation, the installation of equipment.